What is it?
SMED helps reduce the time needed to change a process, machine or service from one type of work to another. It separates activities that require the process to stop from those that can be prepared safely while it is still running.
What's it really for?
It is really for making small batches practical. When changing over is painful, organisations protect themselves with large batches, long queues and less flexibility. A better changeover changes those economics.
You know when…
The final item finishes and the search begins: tools, settings, paperwork, materials and the person who knows the awkward part. The official changeover time starts now, although much of the delay began days earlier.
Have a go
- Observe one complete changeover and record every activity. ☐ Separate internal work requiring a stop from external work that can happen beforehand. ☐ Move suitable preparation outside the stopped period. ☐ Simplify, organise and standardise the remaining steps. ☐ Test safely and repeat.
Why it works
Changeovers often grow around searching, walking, waiting and adjustment. Observing the sequence and moving suitable preparation outside the stopped period shortens downtime without asking people to work faster.
Look for…
Searching, adjustment loops, missing information, tools shared elsewhere, work that could be prepared in advance and tasks that can be performed safely in parallel.
Watch out…
Do not reduce time by removing safety, quality checks or necessary recovery. Involve the people doing the changeover and test the revised sequence under normal conditions.
Worth noticing…
The largest saving often comes before the process stops, in work that nobody had previously counted as part of the changeover.
Try next…
Use Spaghetti Diagram to examine movement. Use 5S to organise tools and materials. Use Standard Work to capture the safer revised sequence.